Project scope;
2x NPP tank 12,000-liter.
Base concrete construction for load 10ton.
Bun concrete with FRP lining 5mm thickness.
Roof and H-beam construction for load 500Kg.
Electric crane 500Kg.
Fire alarm and Safety system
UPV pipe work 3”
Heater, Stirrer, Chemical filter pump, Safety protection system, Control panel.






