CARBON TREATMENT SYSTEM Complete installation and tested 2x 12,000-liter carbon treatment system for copper plating chemical.

 Project scope;

2x NPP tank 12,000-liter.

Base concrete construction for load 10ton.

Bun concrete with FRP lining 5mm thickness.

Roof and H-beam construction for load 500Kg.

Electric crane 500Kg.

Fire alarm and Safety system

 UPV pipe work 3”

Heater, Stirrer, Chemical filter pump, Safety protection system, Control panel.